Changrong logo

OEM BAG MANUFACTURING · DONGGUAN

OEM Bag Manufacturing Process

Changrong's OEM process converts a buyer's reference image, artwork or specification into an approved physical sample and controlled bulk order. The standard starting MOQ is 300 pieces per design, with typical bulk production of 30–50 days after sample approval and deposit confirmation.

Last reviewed: 5 October 2026
Input
Reference image, sketch, artwork or specification
Development
Materials, construction, logo, components and packaging
Sample timing
7–15 days after details are confirmed
Standard MOQ
300 pieces per design
Bulk lead time
30–50 days after sample approval and deposit confirmation
Quality basis
Approved physical sample and written order specification
Packing
Project-specific individual and export packing
Trade terms
FOB and EXW

1. Brief and feasibility review

The first review covers product use, dimensions, construction, material, lining, colour, logo, quantity, packing, destination and target timing. A useful quotation identifies assumptions and exclusions instead of relying on a photograph alone.

2. Material and sample development

Available material, colour, zipper, hardware, lining, logo and packaging directions are aligned before sampling. A physical sample is used to review fit, appearance, function and workmanship. Final details remain subject to the approved sample.

3. Written production approval

Before bulk production, confirm dimensions, approved materials and colour references, components, logo artwork and position, workmanship points, packing method and order quantity. Any changes after approval may affect cost and timing.

4. Production, inspection and export packing

Production follows the approved reference and confirmed order specification. Checks focus on relevant construction, appearance, function, quantity and packing. FOB or EXW scope is recorded in the quotation and order documents.

BUYER CHECKLIST

Approval points before bulk production

  • Approved physical sample
  • Dimensions and construction details
  • Material, lining, colour and components
  • Logo artwork, method and placement
  • Quantity and colour breakdown
  • Individual packing and export carton requirements

CONTINUE YOUR RESEARCH

Useful product and sourcing pages

COMMON BUYER QUESTIONS

Answers for this sourcing route

What is the difference between OEM and ODM bags?

OEM normally begins with the buyer's design or specification. ODM may begin with an existing construction adapted through materials, colours, branding and functional changes. Both routes require an approved specification.

When does bulk lead time begin?

Typical bulk timing is counted after sample approval, material and order details are confirmed, and the required deposit is received.

What makes a quotation more accurate?

Provide product use, dimensions, material, lining, components, logo artwork, quantity, packaging, destination and target timing. Mark unknown items for sample development.

How is quality controlled?

The approved sample and written specification form the production reference. Relevant material, dimensions, construction, function, branding, quantity and packing are checked against confirmed requirements.

Request a production quotation

Send Yoyo your reference image, requirements, quantity and destination market.

Send your RFQ →